Technician bypassed the system
Railway Board officials said that the true meaning In 2007, the technician bypassed the system, as the work was not completed, and manipulated the location box to obtain a ‘green signal’ for the Coromandel Express. This order of Railway Board thus lays down the proper disconnection-reconnection protocol, which is to be followed for signal maintenance, repair, alteration works. This is the third such order on signaling issued by the Railway Board since the accident.
3535
Comments