138 kilometer long route opened in only 138 days Given
138 kilometer long Srinagar route only 138 was opened on 16 March. 16,427 The Srinagar road was closed near Zojilaw at the height of feet. It was closed due to heavy snowfall. 138 kilometer long Manali-Leh road was opened in days. Not only this, the Nimmu-Padam Dararcha road was opened after 138 days. It is situated at an altitude of 16561 ft. These three routes have been prepared to connect with Ladakh.
1656116561
Comments